- Overview
- Product Documentation
- CML Release Notes
- Getting Started
- CML 2.1 User Guide
- CML User's Guide
- Overview of CML 2.x
- Using CML and the HTML5 UI
- Dashboard
- Workbench
- Adding Nodes to a Lab
- Starting, Stopping, and Wiping Nodes
- Deleting Nodes
- Creating Links
- Rules for Creating Links and Interface Overprovisioning
- Adding Interfaces and Overprovisioning
- Overprovisioning Interfaces with Link Creation
- Starting Simulations
- Connecting to a Node's Console
- Setting CPU limit on node
- Launch sequencing and CPU limiting
- Stopping Simulations
- External Connectivity for Simulations
- Link Packet Capture
- Breakout Tool
- Custom VM Images
- Creating a New Node Definition
- CML 2.1 Admin Guide
- Resources
System Upgrade¶
Upgrading the CML server application begins with uploading the upgrade RPM file via Dashboard page. Once the RPM has been uploaded, completing the upgrade is performed in the System Administration Cockpit.
on theProcedure
From the Dashboard, select .
Click Browse, and select the appropriate upgrade RPM file.
Click on the link to open the System Administration Cockpit and log in as the system administrator account. See Logging into the System Administration Cockpit.
Click Controller Software Upgrade to expand that section.
Click Upgrade Controller to start the upgrade process.
The upgrade process starts. The CML controller application will be stopped before the software upgrade begins. The upgrade progress is displayed in the Output section. The controller will reboot upon successful completion of the upgrade.